Product Detail
Product Tags
Related Video
Feedback (2)
Our team through qualified training. Skilled professional knowledge, powerful sense of support, to satisfy the support desires of consumers for Microfiber Warp Knitted Towel , Chopped Mat , Polyester Crepe De Chine Fabric , Accurate process devices, Advanced Injection Molding Equipment, Equipment assembly line, labs and software development are our distinguishing feature.
Big discounting Fiberglass Needle Mat - FCD Double Chopped Stitch Bonding Machine – Yixun Detail:
*This machine is used for producing chopped strand mat,compound mat
Application Case

General assembly drawing

Specifications
| Width |
2800mm 3300mm |
| Gauge: |
F7 |
| Speed: 50-900r/min |
50—900r/min (The specific speed depend the products.) |
| Bar Number |
1 Bar |
| Pattern Drive |
Eccentric Pattern Drive |
| Warp Beam Support |
30 inches beam.EBC |
| Take-up Device |
Electronic Take-up |
| Batching Device |
Electronic Batching |
| Chopped Device |
2 Chopped Device,Servo System Controlling. |
| Feeding Equipment |
Parallel feeding Servo System Controlling |
| Power |
17kW |
|
This type’ s machine could be personal designed |
Product detail pictures:
Related Product Guide:
With our loaded working experience and thoughtful products and services, we've got been acknowledged as a reputable supplier for most international buyers for Big discounting Fiberglass Needle Mat - FCD Double Chopped Stitch Bonding Machine – Yixun , The product will supply to all over the world, such as: Qatar, Afghanistan, Provence, With good quality, reasonable price and sincere service, we enjoy a good reputation. Products are exported to South America, Australia, Southeast Asia and so on. Warmly welcome customers at home and abroad to cooperate with us for the brilliant future.
Managers are visionary, they have the idea of "mutual benefits, continuous improvement and innovation", we have a pleasant conversation and Cooperation.
By Karen from South Korea - 2017.02.14 13:19
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
By Joyce from Burundi - 2017.02.18 15:54